Importance Performance Analysis of Factors Causing Reworks in the Construction Industry

Authors

  • Andi Andi Postgraduate Program in Civil Engineering, Petra Christian University, Surabaya
  • Jani Rahardjo Postgraduate Program in Civil Engineering, Petra Christian University, Surabaya
  • Fendy Fendy PT. Sutandi Jaya Sejahtera, Surabaya

:

https://doi.org/10.9744/ced.22.2.52-57

Keywords:

Importance performance analysis, rework, project construction.

Abstract

Rework can bring negative effect to construction project. This research aims to identify the importance level of factors causing reworks in structural, finishing, and mechanical, electrical and plumbing (MEP) works by a way of importance performance analysis (IPA). In order to reach this objective, the research evaluates the degree of occurrence the factors in each type of works and analyzes the level of difficulty in preventing the occurrence of the factors. The results are based on questionnaire survey, involving general and MEP contractors in Surabaya. Design related factors are the most frequent and most difficult to prevent in structural and finishing works. In MEP works, the most frequent factors are tight construction duration and unclear instructions from owner and designer; whilst insufficient owner’s capital is the most difficult to prevent. The research finds two factors that have high importance level, i.e. design changes and insufficient detail drawings.

References

Burati, J.L., Farrington, J.J., and Ledbetter, J.B., Causes of Quality Deviations in Design and Construction, Journal of Construction Engineer¬ing and Management, 118, 1992, pp. 34-49.

Barber, P., Sheath, D., Tomkins, C., and Graves, A., The Cost of Quality Failures in Major Civil Engineering Projects, International Journal of Quality and Reliability Management, 17(4/5), 2000, pp. 479-492.

Love, P.E.D., Influence of Project Type and Procurement Method on Rework Cost in Building Construction Projects, Journal of Construction Engineering and Management, 128, 2002, pp. 18-29.

Love, P.E.D., Edwards, D.J., Watson, H., and Davis, P., Rework in Civil Infrastructure Projects: Determination of Cost Predictor, Journal of Construction Engineering and Management, 136, 2010, pp. 275-282.

Zhang, D., Haas, C.T., Goodrum, P.M., Carlos, H.C., and Robin, G., Construction Small-Project Rework Reduction for Capital Facilities, Journal of Construction Engineering and Management, 138, 2012, pp. 1377-1385.

Andi., Winata, S., and Hendralim, Y., Faktor-Faktor Penyebab Rework pada Pekerjaan Konstruksi, Civil Engineering Dimension, 7, 2005, pp. 22-29.

Sutrisna, N., Thanaya, I.N.A., and Sudipta, I.G.K. Analisis Rework pada Proyek Kon¬struk¬si Gedung di Kabupaten Badung, Jurnal Spektran, 1(2), 2013.

Herdianto, A., Tangjungsari, A.D.R., Hidayat, A., and Hatmoko, J.U.D., Evaluasi Pengerjaan Ulang (Rework) pada Proyek Konstruksi Gedung di Semarang, Jurnal Karya Teknik Sipil, 4(1), 2015, pp. 93-106.

Construction Industry Development Agency (CIDA), Measuring Up or Muddling Tough: Best Practice in the Australian Non-Residential Con¬struction Industry, CIDA and Masters Builders Australia, Sydney, Australia, 1995.

Love, P.E.D., Holt, G.D., Shen, L.Y. Li, H., and Irani, Z., Using Systems Dynamics to Better Understand Change and Rework in Construction Project Management Systems. International Jour¬nal of Project Management, 20, 2002, pp. 425-436.

Rogge, D.F., Cogliser, C., Alaman, H., and McCormack, S., An Investigation of Field Rework in Industrial Construction, Construction Industry Institute, 2001, Austin, TX.

Taylor, T. and Ford, D. Managing Tipping Point Dynamics in Complex Construction Projects, Jour-nal of Construction Engineering and Mana¬ge¬ment, 134, 2008, pp. 421-431.

Fayek, A.R., Dissanayake, M., and Campero, O., Developing a Standard Methodology for Mea¬suring and Classifying Construction Field Rework, Canadian Journal of Civil Engineering, 31, 2004, pp. 1077-1089.

Hwang, B., Thomas, S.R., Haas, C.T., and Caldas, C.H., Measuring The Impact of Rework on Construction Cost Performance, Journal of Construction Engineering and Management, 135, 2009, pp. 187-198.

Chundawan, E. and Alifen, R.S., Model Sumber dan Penyebab Rework pada Tahapan Proyek Kon-struksi, Jurnal Dimensi Utama Teknik Sipil, 1, 2014.

Ye, G., Jin, Z., Xia, B., and Martin, Analyzing Causes for Reworks in Construction Projects in China, Journal of Construction Engineering and Management, 31, 2014.

Downloads

Published

2020-10-06

How to Cite

Andi, A., Rahardjo, J., & Fendy, F. (2020). Importance Performance Analysis of Factors Causing Reworks in the Construction Industry. Civil Engineering Dimension, 22(2), 52-58. https://doi.org/10.9744/ced.22.2.52-57

Most read articles by the same author(s)