Table of Contents
Articles
ALTERNATIF METODA PENJADWALAN PROYEK KONSTRUKSI MENGGUNAKAN TEORI SET SAMAR | |
Andreas Wibowo | pp. 1-8 |
A CASE STUDY ON TOTAL BUILDING PERFORMANCE EVALUATION OF AN INTELLIGENT OFFICE BUILDING IN SINGAPORE | |
Po Seng Kian, Henry Feriadi, Wiliana Sulistio, Kong Chee Seng | pp. 9-15 |
ANALISIS HUBUNGAN SISTEM BANGUNAN DENGAN KINERJA TOTAL DAN INTEGRASI BANGUNAN PADA BERBAGAI GEDUNG BERTINGKAT DI SURABAYA | |
Herry Pintardi Chandra | pp. 16-23 |
PENELITIAN PENDAHULUAN PENGGUNAAN BENDA UJI KUBUS BETON PADA PERKERASAN LENTUR TYPE CEMENT TREATED BASE CTB | |
Harry Patmadjaja, Suhartono Irawan | pp. 24-29 |
PENGGUNAAN FLY ASH DAN VISCOCRETE PADA SELF COMPACTING CONCRETE | |
Handoko Sugiharto, Gideon Hadi Kusuma | pp. 30-35 |
THE USE OF OUTRIGGER AND BELT TRUSS SYSTEM FOR HIGH-RISE CONCRETE BUILDINGS | |
Po Seng Kian | pp. 36-41 |
APLIKASI MATERIAL REQUIREMENT PLANNING UNTUK MENGENDALIKAN INVESTASI PENGADAAN MATERIAL PADA PT. JHS PILLING SYSTEM | |
Herry P. Chandra, Harry Patmadjaja | pp. 42-50 |