[1]
2004. ANALISA PRODUKTIFITAS PEKERJA DENGAN METODE WORK SAMPLING STUDI KASUS PADA PROYEK X DAN Y. Civil Engineering Dimension. 6, 2 (Sep. 2004), pp. 72–79. DOI:https://doi.org/10.9744/ced.6.2.pp. 72-79.