[1]
2004. ANALISA WHAT IF SEBAGAI METODE ANTISIPASI KETERLAMBATAN DURASI PROYEK. Civil Engineering Dimension. 1, 2 (Jun. 2004), pp. 103–113. DOI:https://doi.org/10.9744/ced.1.2.pp. 103-113.