[1]
Andi, A., Susandi, S. and Wijaya, H. 2004. ON REPRESENTING FACTORS INFLUENCING TIME PERFORMANCE OF SHOP-HOUSE CONSTRUCTIONS IN SURABAYA. Civil Engineering Dimension. 5, 1 (Jun. 2004), pp. 7-13. DOI:https://doi.org/10.9744/ced.5.1.pp. 7-13.