[1]
Andi, A., wibowo, koento danny and Prasetya, A. 2004. ANALISA PRODUKTIFITAS PEKERJA DENGAN METODE WORK SAMPLING STUDI KASUS PADA PROYEK X DAN Y. Civil Engineering Dimension. 6, 2 (Sep. 2004), pp. 72-79. DOI:https://doi.org/10.9744/ced.6.2.pp. 72-79.