[1]
Maryoto, A. and Shimomura, T. 2015. Prediction of Crack Width Due to Corrosion of PC Tendon in Prestressed Concrete Structures. Civil Engineering Dimension. 17, 2 (Sep. 2015), 67-75. DOI:https://doi.org/10.9744/ced.17.2.67-75.