APLIKASI MATERIAL REQUIREMENT PLANNING UNTUK MENGENDALIKAN INVESTASI PENGADAAN MATERIAL PADA PT. JHS PILLING SYSTEM. (2004). Civil Engineering Dimension, 3(1), pp. 42-50. https://doi.org/10.9744/ced.3.1.pp. 42-50