PERBAIKAN MUTU PADA PROSES DAN PRODUKSI SPUN-PILE DENGAN MENGGUNAKAN METODE TAGUCHI. (2004). Civil Engineering Dimension, 1(2), pp. 59-64. https://doi.org/10.9744/ced.1.2.pp. 59-64