D.M.P., W.; A., F. Applying Fuzzy Analytic Hierarchy Process (FAHP) -Cut Based and TOPSIS Methods to Determine Bali Provincial Road Handling Priority. Civil Engineering Dimension, [S. l.], v. 13, n. 2, p. 98-106, 2011. DOI: 10.9744/ced.13.2.98-106. Disponível em: https://ced.petra.ac.id/index.php/civ/article/view/18229. Acesso em: 20 apr. 2024.