[1]
“ALTERNATIF METODA PENJADWALAN PROYEK KONSTRUKSI MENGGUNAKAN TEORI SET SAMAR ”, ced, vol. 3, no. 1, pp. pp. 1–8, Jun. 2004, doi: 10.9744/ced.3.1.pp. 1-8.