search
  • Home
  • Current
  • Archives
  • Announcements
  • About
    • About the Journal
    • Submissions
    • Editorial Team
    • Privacy Statement
    • Contact
  • Register
  • Login
  • Search
ced
  • Register
  • Login
Skip to main content Skip to main navigation menu Skip to site footer
ced
  • Home
  • Current
  • Archives
  • Announcements
  • About
    • About the Journal
    • Submissions
    • Editorial Team
    • Privacy Statement
    • Contact
Online ISSN : 1979-570X
Print ISSN : 1410-9530
  1. Home /
  2. Search

Search

Advanced filters
1 - 10 of 14 items 1 2 > >> 

Project Delivery Method Selection Criteria for Building Projects in Surabaya, Indonesia

DOI : 10.9744/ced.26.2.111-119
Andi , Stephanus Eduard Sugianto , Yosep Setiadi Lukas
111-119
Abstract : 849
PDF : 1473
DOI : 10.9744/ced.26.2.111-119

A Hybrid Failure Mode and Effects Analysis–Decision Tree Framework for Integrated Occupational Health and Safety Risk Assessment: A Case in Military Building Construction

DOI : 10.9744/ced.28.2.204-218
Lendra , Norhaliza Qammatasya , Dewantoro , Andi
204-218
Abstract : 245
PDF : 357
DOI : 10.9744/ced.28.2.204-218

The Impact of Contractor Safety Leadership on Workers Safety Behavior

DOI : 10.9744/ced.24.2.93-100
Andi Andi , Stephen Hans Sumali , Giovanni Ferdinand Limansantoso
93-100
Abstract : 673
PDF : 1146
DOI : 10.9744/ced.24.2.93-100

Importance Performance Analysis of Factors Causing Reworks in the Construction Industry

DOI : 10.9744/ced.22.2.52-57
Andi Andi , Jani Rahardjo , Fendy Fendy
52-58
Abstract : 347
PDF : 566
DOI : 10.9744/ced.22.2.52-57

Modeling The Influence of Project Manager Trustworthy Leadership Behavior Upon Construction Team Trust

DOI : 10.9744/ced.10.2.pp. 109-117
Andi Andi , Herry Santoso , Jonathan Simanjuntak
pp. 109-117
Abstract : 213
PDF : 328
DOI : 10.9744/ced.10.2.pp. 109-117

Construction Workers Perceptions Toward Safety Culture

DOI : 10.9744/ced.10.1.pp. 1-6
Andi Andi
pp. 1-6
Abstract : 271
PDF : 452
DOI : 10.9744/ced.10.1.pp. 1-6

HUMAN RESISTANCE TO THE USE OF INFORMATION TECHNOLOGY IN CONSTRUCTION COMPANIES

DOI : 10.9744/ced.7.2.pp. 68-74
Andi Andi , Fani Fani , Heru Purwoadi
pp. 68-74
Abstract : 202
PDF : 292
DOI : 10.9744/ced.7.2.pp. 68-74

FAKTOR-FAKTOR PENYEBAB REWORK PADA PEKERJAAN KONSTRUKSI

DOI : 10.9744/ced.7.1.pp. 22-29
Andi Andi , Samuel Winata , Yanto Handarlim
pp. 22-29
Abstract : 400
PDF : 793
DOI : 10.9744/ced.7.1.pp. 22-29

ANALISA PRODUKTIFITAS PEKERJA DENGAN METODE WORK SAMPLING STUDI KASUS PADA PROYEK X DAN Y

DOI : 10.9744/ced.6.2.pp. 72-79
Andi Andi , koento danny wibowo , Andri Prasetya
pp. 72-79
Abstract : 512
PDF : 1127
DOI : 10.9744/ced.6.2.pp. 72-79

MOTIVASI PEKERJA PADA BEBERAPA PROYEK KONSTRUKSI DI SURABAYA

DOI : 10.9744/ced.6.2.pp. 80-87
Andi Andi , Dwi Djendoko
pp. 80-87
Abstract : 238
PDF : 461
DOI : 10.9744/ced.6.2.pp. 80-87
1 - 10 of 14 items 1 2 > >> 

SidebarMenu

  Focus and Scope   Peer Reviewers   Author Guidelines   Peer Review Process   Publication Ethics   Article Processing Charge   Open Access Statement   Plagiarism Check   Accreditation   Indexing   Journal Template

 

scimago

SCImago Journal & Country Rank

scopus index

National Accreditation

Accredited by the Directorate General of Higher Education under the Ministry of Higher Education, Science, and Technology, Republic of Indonesia

issn

ISSN

e-ISSN 1979-570X

IndexedBy

Indexed In

tools

Tools

Journal Metrics

Last 5 years · 2022–2026
795 Submissions received
10% Acceptance rate
68 Days to first decision
98 Submissions published

Author Diversity

Indonesia 83%
Malaysia 2%
India 2%
United States 2%
United Kingdom 1%
Other 9%

Journal Metrics

Last 5 years · 2022–2026
268 active submissions in workflow
121 Submission
135 Review
11 Copyediting
1 Production

Submissions

Received 795 (159/year)
Accepted 98 (20/year)
Declined · desk reject 697 (139/year)
Declined · after review 223 (45/year)
Published 98 (20/year)
Other submissions 268 (54/year)
In progress 66 (13/year)
Imported 202 (40/year)

Timing

Days to first decision 68 day(s)
Days to acceptance 219 day(s)
Days to reject 70 day(s)

Outcome

Acceptance rate 10%

Author Diversity · 18 countries

Indonesia 282 83%
Malaysia 8 2%
India 7 2%
United States 6 2%
United Kingdom 5 1%
United Arab Emirates 4 1%
Nigeria 4 1%
Iraq 3 1%
Iran 3 1%
Jordan 3 1%
Taiwan 3 1%
Philippines 3 1%
Australia 2 1%
Japan 2 1%
New Zealand 1 <1%
Thailand 1 <1%
Netherlands 1 <1%
U.S. Virgin Islands 1 <1%

visitor

Visitor

Visitors

stats

Statistic

Web AnalyticsView My Stats

Editorial Pick

Numerical Investigation of Seismic Responses of Fault-Crossing Segmental Water Conveyance Tunnel

September 17, 2026
Ridhwan Afnan Primadika et al.
Vol. 28 No. 2 (2026): SEPTEMBER 2026

Finite Element-based Optimization of Shear-Strengthening Strategies for I-Shaped RC Beams using Hybrid Materials and Plate Reinforcement

September 17, 2026
Mayadah W. Falah et al.
Vol. 28 No. 2 (2026): SEPTEMBER 2026

Pull-Out Strength of Rebar Embedded in Fiber-Reinforced High-Strength Concrete Utilizing Dimensional Analysis

September 17, 2026
Felvic Vienes et al.
Vol. 28 No. 2 (2026): SEPTEMBER 2026

Enhancement of Point Cloud Data for Rock Slope Stability Analysis

September 17, 2026
Aniza Albar et al.
Vol. 28 No. 2 (2026): SEPTEMBER 2026

Probabilistic Analysis of the Failure Time of Concrete-Filled Steel Tube (CFST) Columns under Post-Blast Fire Loading

September 17, 2026
Alireza Afaghi-Darabi et al.
Vol. 28 No. 2 (2026): SEPTEMBER 2026

Address

  • Institute of Research and Community Outreach
  • Petra Christian University
  • Jl. Siwalankerto 121-131, Surabaya 60236, Indonesia

Contact Info:

  • Phone: +62-31-2983392; +62-31-2983147
  • Homepage: https://ced.petra.ac.id/
  • E-mail: [email protected]

Publisher

  • Petra Christian University, Indonesia
Copyright © 2026 Journal Civil Engineering Dimension , All rights reserved. Licensed under Creative Commons License a Creative Commons Attribution 4.0 International License. Site using Noble OJS 3 Theme
Themes by Openjournaltheme.com Themes by Openjournaltheme.com