Managing Pre-Construction and Construction Risks on Project Sites in Abuja-Nigeria
DOI:
https://doi.org/10.9744/ced.18.1.1-7Keywords:
Construction, process, pre-construction, risk, risk management, risk response.Abstract
Managing risks in construction projects has been acknowledged as a key direction process for the purposes of attaining the project goal in terms of time, cost, quality, safety, and environmental sustainability. Hence, the paper evaluated pre-construction and construction risks on active project sites in Abuja-Nigeria. This was achieved using survey method through the self-administration of 35 questionnaires to the professionals handling the 35 identified projects being undertaking at that time. Results showed that errors and omissions in design and improperly defined project scope had mean score values of 3.03 and 2.54, respectively, were the construction risks most experienced by the professionals during pre-construction. On the other hand, fluctuation in market prices and delays with mean score values of 3.14 and 2.74, respectively, were the construction risks experienced by the professionals during the construction phase of the projects. It is recommended that procurement methods such as construction management should be adopted and stakeholders should keep to their own side of the bargain to avoid unnecessary delays.References
KarimiAzari, A., Mousavi, N,S., Farid-Mousavi, S.F., and Hosseini, S., Risk Assessment Model Selection in Construction Industry, Journal of Expert Systems with Applications, 38, 2011, pp. 9105–9111. [CrossRef]
Baloi, D. and Price, A.D.F., Modelling Global Risk Factors affecting Construction Cost Performance, International Journal of Project Management, 21, 2003, pp. 261–269. [CrossRef]
Hillson, D., Extending the Risk Process to Manage Opportunities, International Journal of Project Management, 20(3), 2002, pp. 235–240. [CrossRef]
Olsson, R., In Search of Opportunity Management: Is the Risk Management Process Enough, International Journal of Project Management, 25, 2007, pp. 745–752. [CrossRef]
Hillson, D., Effective Opportunity Management for Projects – Exploiting Positive Risk, Marcel Dekker, New York, 2004. [CrossRef]
Perminova, O., Gustafsson, M., and Wikstrom, K., Defining Uncertainty in Projects – A New Perspective, International Journal of Project Management, 26, 2008, pp. 73–79. [CrossRef]
Klemetti, A., Risk Management in Construction Project Networks, Laboratory of Industrial Mana-gement, Helsinki University of Technology, 2006. [CrossRef]
Chapman, C.B. and Ward, S.C., Project Risk Management: Processes, Techniques and Insights, 2nd edition, John Wiley and Sons, Chichester, 2003. [CrossRef]
Enshassi, A., Mohamed, S., and Abu-Mosa, J., Risk Management in Building Projects in Palestine: Contractors’ Perspective, Emirates Journal for Engineering Research, 13(1), 2008, pp. 29-44. [CrossRef]
Dikmen, I., Birgonul, M.T., and Han, S., Using Fuzzy Risk Assessment to Rate Cost Overrun Risk in International Construction Projects, International Journal of Project Management, 25, 2007, pp. 494–505. [CrossRef]
Thevendran, V. and Mawdesley, M.J., Perception of Human Risk Factors in Construction Projects: An Exploratory Study, International Journal of Project Management, 22, 2004, pp. 131-137. [CrossRef]
Simu, K., The Construction Site Manager's Impact on Risk Management Performance, Doctoral Thesis, Department of Civil, Mining and Environmental Engineering, Luleå University of Technology, 2009. [CrossRef]/li>
Pangeran, M.H., Pribadi, K.S., Wirahadikusumah, R.D., and Notodarmojo, S., Assessing Risk Management Capability of Public Sector Orga-nisations Related to PPP Scheme Development for Water Supply in Indonesia, Civil Engineering Dimension, 14(1), 2012, pp. 26-35. [CrossRef]
Adelusi, A.K., Assessment of Risk and Risk Management Stages in Nigerian Construction Industry, Unpublished B. Tech Project, Department of Quantity Surveying, Federal University of Technology, Akure-Nigeria, 2009. [CrossRef]
Dikmen, I., Birgonul, M.T., Anac, C., Tah, J.H. M., and Aouad, G., Learning from Risks: A Tool for Post-Project Risk Assessment, Automation in Construction, 18, 2008, pp. 42– 50. [CrossRef]
Uher, T., Programming and Scheduling Techniques, UNSW Press, Sydney, 2003 [CrossRef]
Mills, A., A Systematic Approach to Risk Manage-ment for Construction, Structural Survey, 19(5), 2001, pp. 245-252. [CrossRef]
Patrick, X.W.Z., Guomin Z., and Jia-Yuan, W., Identifying Key Risks in Construction Projects: Life Cycle and Stakeholder Perspectives, 2006, retrieved from http://prres. net/Papers/Zou_risks_ in_construction_project.pdf. [CrossRef]
Andi, Appropriate Allocation of Contingency using Risk Analysis Methodology, Civil Engineering Dimension, 6(1), 2004, pp. 40-48. [CrossRef]
Royer, P.S., Risk Management: The Undis-covered Dimension of Project Management, Project Management Journal, 31(1), 2000, pp. 6-13. [CrossRef]
Kaoje, B.B., Risk Management in Construction using Web-based Collaboration to Manage Project Risk, Proceedings of the 40th Annual General Meeting/Conference of the Nigerian Institute of Building: Risk Management in Construction, August, 2010. [CrossRef]
Zayed, T., Amer, M., and Pan, J., Assessing Risk and Uncertainty Inherent in Chinese Highway Projects using AHP, International Journal of Project Management, 26, 2008, pp. 408– 419. [CrossRef]
Rouse, M., Essential Guide to Business Conti-nuity and Disaster Recovery Plans, Risk Analysis, CW Europe, Australia, 2010. [CrossRef]
Thaheem, J., A Review of Quantitative Analysis Techniques for Construction Project Risk Mana-gement, Creative Construction Conference, Budapest, Hungary, 2012. [CrossRef]
Hillson, D. and Murray-Webster, R., Understanding and Managing Risk Attitude, Gower Publishing Limited, Hampshire, 2005. [CrossRef]
Bresnen, M. and Marshall, N., Understanding the Diffusion and Application of New Management Ideas in Construction, Engineering, Construction and Architectural Management, 8(5/6), 2001, pp. 335-345. [CrossRef]
Burke, R., Project Management Techniques, Burke Publishing, South Africa, 2010. [CrossRef]
The Associated General Contractors of America and The Council of Educational Facility Planners International, Construction Manager at Risk, 2002, retrieved from http://agchouston.org/ files/2027_Construction_Manager_at_Risk_Reference_Document.pdf. [CrossRef]
Collis, J. and Hussey, R., Business Research: A Practical Guide for Undergraduate and Post-graduate Students, 2nd edition, Palgrave Macmillan, New York, 2003. [CrossRef]
Collins, K.M.T., Onwuegbuzie, A.J., and Jiao, Q.G., A Mixed Methods Investigation of Mixed Methods Sampling Designs in Social and Health Science Research, Journal of Mixed Methods Research, 1(3), 2007, pp. 267-294. [CrossRef]
Morenikeji, W., Research and Analytical Methods (for Social Scientists, Planners and Environmentalists), Jos University Press Limited, Jos, 2006. [CrossRef]
Downloads
Published
How to Cite
Issue
Section
License
Authors who publish with this journal agree to the following terms:- Authors retain the copyright and publishing right, and grant the journal right of first publication with the work simultaneously licensed under a Creative Commons Attribution License that allows others to share the work with an acknowledgement of the work's authorship and initial publication in this journal.
- Authors are able to enter into separate, additional contractual arrangements for the non-exclusive distribution of the journal's published version of the work (e.g., post it to an institutional repository or publish it in a book), with an acknowledgement of its initial publication in this journal.
- Authors are permitted and encouraged to post their work online (e.g., in institutional repositories or on their website) followingthe publication of the article, as it can lead to productive exchanges, as well as earlier and greater citation of published work (See The Effect of Open Access).