KETERLAMBATAN WAKTU PELAKSANAAN PROYEK KLASIFIKASI DAN PERINGKAT DARI PENYEBAB-PENYEBABNYA
:
https://doi.org/10.9744/ced.1.1.pp.%2046-58Keywords:
construction delay, causes of delay, planning and scheduling, contractor, owner.Abstract
Successfully executing construction project within schedule is one of the most important aims, both for the owner and the contractor. Construction delay is a condition which is completely unwanted, because it will cause lost of money and time for both parties. Research in finding factors which are dominant or having great influences as the causes of delay, is intended to prepare and build the construction planning and scheduling more complete and accurate; so that delay can be avoided or controlled. Confirmation to the founded causes by site surveys using questionaire distributed to contractors, have shown that problems arisen from inaccurate workplan, lack of resources. lack of communication/coordination, were dominant factors for causing construction delay from contractor side. On the other hand, the owner side, problems arisen from incomplete and unclear design and scope of works, inspection and control system of the project were dominant for causing delay.Abstract in Bahasa Indonesia :
Keberhasilan melaksanakan proyek konstruksi tepat pada waktunya adalah salah satu tujuan terpenting, baik bagi pemilik maupun kontraktor. Keterlambatan adalah sebuah kondisi yang sangat tidak dikehendaki, karena akan sangat merugikan kedua belah pihak dari segi waktu dan biaya. Penelitian ini bertujuan menemukan faktor-faktor yang sangat berperan atau mendominasi sebagai penyebab keterlambatan, dengan maksud agar proses perencanaan dan penjadwalan proyek konstruksi dapat dilakukan dengan lebih lengkap dan cermat; sehingga keterlambatan sedapat mungkin dihindarkan atau dikendalikan. Temuan penyebab-penyebab keterlambatan, yang dikonfirmasikan dengan sigi lapangan menggunakan kuesioner yang didistribusikan kepada kontraktor, menunjukkan bahwa masalah-masalah tidak seksamanya rencana kerja, tidak tersedianya sumber daya dan kurangnya komunikasi/koordinasi, merupakan faktor-faktor yang dominan sebagai penyebab keterlamabatan dari sisi kontraktor. Dari sisi pemilik proyek, masalah ketidaklengkapan dan ketidakjelasan desain dan lingkup pekerjaan, masalah sistim pengawasan dan pengendalian proyek, merupakan faktor yang dominan sebagai penyebab keterlambatan. Kata kunci : keterlambatan pelaksanaan, penyebab keterlambatan, perencanaan dan penjadwalan, kontraktor, pemilik
Downloads
Published
2004-06-01
How to Cite
Proboyo, B. (2004). KETERLAMBATAN WAKTU PELAKSANAAN PROYEK KLASIFIKASI DAN PERINGKAT DARI PENYEBAB-PENYEBABNYA. Civil Engineering Dimension, 1(1), pp. 46-58. https://doi.org/10.9744/ced.1.1.pp. 46-58
Issue
Section
Articles
License
Authors who publish with this journal agree to the following terms:- Authors retain the copyright and publishing right, and grant the journal right of first publication with the work simultaneously licensed under a Creative Commons Attribution License that allows others to share the work with an acknowledgement of the work's authorship and initial publication in this journal.
- Authors are able to enter into separate, additional contractual arrangements for the non-exclusive distribution of the journal's published version of the work (e.g., post it to an institutional repository or publish it in a book), with an acknowledgement of its initial publication in this journal.
- Authors are permitted and encouraged to post their work online (e.g., in institutional repositories or on their website) followingthe publication of the article, as it can lead to productive exchanges, as well as earlier and greater citation of published work (See The Effect of Open Access).