ALTERNATIF METODA PENJADWALAN PROYEK KONSTRUKSI MENGGUNAKAN TEORI SET SAMAR
DOI:
https://doi.org/10.9744/ced.3.1.pp.%201-8Abstract
Program Evaluation Review Technique %28PERT%29 is a scheduling method that consider the uncertainty of the duration of an activity. It assumes a probability density function with a beta distribution. PERT simplifies the analysis using specific values of parameters of beta distribution. The analysis of critical paths consider the mean of the duration only and the probability of the expected total duration are based on critical paths only. Some cases showed that these simplifications cause errors and contradictions. This paper proposes an alternative scheduling method that also allows uncertainties of duration. The method%2C named Fuzzy Logic Application for Scheduling %28FLASH%29%2C applies a fuzzy set theory which is a perfect means for modeling uncertainties arising from mental phenomena which are neither random nor stochastic. It does not require statistical data but needs qualitative observations. Unlike PERT%2C FLASH considers all paths%2C not only critical path%28s%29%2C to analyze the possibility of an expected total duration.Abstract in Bahasa Indonesia :
Program Evaluation Review Technique %28PERT%29 merupakan suatu metoda penjadwalan dengan menimbang durasi aktivitas yang bersifat tidak pasti. PERT mengasumsikan fungsi kerapatan probabilitas durasi aktivitas mengikuti distribusi beta. Analisis dalam PERT disederhanakan dengan menggunakan nilai-nilai tertentu parameter distribusi beta. Penentuan jalur kritis hanya menimbang mean durasi untuk menentukan jalur kritis%2C dan probabilitas total durasi didapatkan berdasarkan jalur kritis saja. Beberapa kasus menunjukkan penyederhanaan ini menimbulkan galat dan kontradiksi. Tulisan ini mengusulkan metoda penjadwalan alternatif yang juga menimbang durasi yang bersifat tidak pasti. Metoda ini%2C yang dinamakan Fuzzy Logic Application for Scheduling %28FLASH%29%2C menerapkan teori set samar sebagai satu cara untuk memodelkan ketidakpastian yang muncul dari fenomena mental yang bukan bersifat acak maupun stokastik. FLASH tidak mensyaratkan data statistis tetapi hanya pengamatan secara kualitatif. FLASH mempertimbangkan semua jalur%2C tidak hanya jalur kritis saja seperti PERT%2C untuk menganalisis posibilitas suatu total durasi yang diharapkan. scheduling+method%2C+FLASH%2C+PERT%2C+probability%2C+possibility%2C+fuzzy+set.
Downloads
Published
2004-06-02
How to Cite
Wibowo, A. (2004). ALTERNATIF METODA PENJADWALAN PROYEK KONSTRUKSI MENGGUNAKAN TEORI SET SAMAR . Civil Engineering Dimension, 3(1), pp. 1–8. https://doi.org/10.9744/ced.3.1.pp. 1-8
Issue
Section
Articles
License
Authors who publish with this journal agree to the following terms:- Authors retain the copyright and publishing right, and grant the journal right of first publication with the work simultaneously licensed under a Creative Commons Attribution License that allows others to share the work with an acknowledgement of the work's authorship and initial publication in this journal.
- Authors are able to enter into separate, additional contractual arrangements for the non-exclusive distribution of the journal's published version of the work (e.g., post it to an institutional repository or publish it in a book), with an acknowledgement of its initial publication in this journal.
- Authors are permitted and encouraged to post their work online (e.g., in institutional repositories or on their website) followingthe publication of the article, as it can lead to productive exchanges, as well as earlier and greater citation of published work (See The Effect of Open Access).