APLIKASI MATERIAL REQUIREMENT PLANNING UNTUK MENGENDALIKAN INVESTASI PENGADAAN MATERIAL PADA PT. JHS PILLING SYSTEM
Vol. 3 No. 1 (2001): MARCH 2001
Articles
Downloads
Abstract in Bahasa Indonesia :
Material Requirement Planning adalah suatu metode untuk menentukan apa, kapan dan berapa jumlah komponen dan material yang dibutuhkan untuk memenuhi kebutuhan dari suatu perencanaan produksi. Penelitian bertujuan untuk mempelajari sejauh mana aplikasi Material Requirement Planning dapat mengendalikan investasi pengadaan material pada PT. JHS Pilling System. Hasil penelitian menunjukkan bahwa aplikasi metode Material Requirement Planning memberikan nilai cumulative material investment dan overdue investment yang lebih rendah daripada pengeluaran PT. JHS Pilling System saat ini.
APLIKASI MATERIAL REQUIREMENT PLANNING UNTUK MENGENDALIKAN INVESTASI PENGADAAN MATERIAL PADA PT. JHS PILLING SYSTEM. (2004). Civil Engineering Dimension, 3(1), pp. 42-50. https://doi.org/10.9744/ced.3.1.pp. 42-50
Authors who publish with this journal agree to the following terms:
- Authors retain the copyright and publishing right, and grant the journal right of first publication with the work simultaneously licensed under a Creative Commons Attribution License that allows others to share the work with an acknowledgement of the work's authorship and initial publication in this journal.
- Authors are able to enter into separate, additional contractual arrangements for the non-exclusive distribution of the journal's published version of the work (e.g., post it to an institutional repository or publish it in a book), with an acknowledgement of its initial publication in this journal.
- Authors are permitted and encouraged to post their work online (e.g., in institutional repositories or on their website) followingthe publication of the article, as it can lead to productive exchanges, as well as earlier and greater citation of published work (See The Effect of Open Access).

How to Cite
APLIKASI MATERIAL REQUIREMENT PLANNING UNTUK MENGENDALIKAN INVESTASI PENGADAAN MATERIAL PADA PT. JHS PILLING SYSTEM. (2004). Civil Engineering Dimension, 3(1), pp. 42-50. https://doi.org/10.9744/ced.3.1.pp. 42-50





