Assessing Risk Management Capability of Public Sector Organizations Related to PPP Scheme Development for Water Supply in Indonesia
Downloads
Downloads
Pribadi, K,S., Soekirno, P., and Pangeran, M.H., Integrating Qualitative and Quantitative Risk Analysis for Investment in Public-Private Part¬ner-ship Scheme for Water Supply in Indonesia, Proceedings of the Tenth East Asia-Pacific Conference on Structural Engineering and Construction, Bangkok, 2006, pp. 201-208.
Haarmeyer, D. and Mody, A., Financing Water and Sanitation Projects–The Unique Risks, World Bank Public Policy for the Private Sector, Note No. 151, 1998.
Dailami, M. and Leipziger, D., Infrastructure Project Finance and Capital Flows: A New Perspective, World Development, 26 (7), 1998, pp. 1283-1298.
Dixon, T., Pottinger, G., and Jordan, A., Lessons From the Private Finance Initiative in the UK–Benefits, Problems and Critical Success Factors', Journal of Property Investment and Finance, 23 (5), 2005, pp. 412-423.
Li, B., Akintoye, A., Edwards, P.J. and Hardcastle, C., Critical Success Factors for PPP/PFI Projects in the UK Construction Industry, Construction Management and Economics, 23 (5), 2005, pp. 459- 471.
Australian Government Department of Finance and Administration, Public Private Partnerships: Risk Management, Commonwealth of Australia, 2006.
Akintoye, A., Fitzgerald, E. and Hardcastle, C., Risk Management for Local Authorities’ Private Finance Initiative Projects, Glasgow Caledonian University, 1999.
Akerele, D and Gidado, K., The Risks and Constraints in the Implementation of PFI/PPP in Nigeria, Proceedings of 19th Annual ARCOM Conference, Vol 1, 2003, pp. 379-391.
Ng, A. and Loosemore, M., Risk Allocation in the Private Provision of Public Infrastructure, International Journal of Project Management, 25, 2006, pp. 66-76.
INCOSE Risk Management Working Group, PMI Risk Management Specific Interest Group and UK APM Risk Specific Interest Group, Risk Management Maturity Level Development, Risk Management Research and Development Program Collaboration, 2002.
Presidential Regulation of Republic of Indonesia No. 67 year 2005 on The Cooperation between the Government and the Business Entities in the Provision of Infrastructure.
Pangeran, M.H., Pribadi, K.S. and Wirahadi-kusumah, R.D., Kerjasama Pemerintah dan Swasta Dalam Pengelolaan Infrastruktur: Usulan Model Untuk Mengukur Kematangan Manajemen Risiko Para Pihak yang Terkait, Prosiding Seminar Nasional Teknik Sipil VI, Surabaya, 2010, pp. C.187-197.
Khalfan, M.M.A., Anumba, C.J. and Carrillo, P.M., Development of a Readiness Assessment Model for Concurrent Engineering in Construction, Benchmarking: An International Journal, 8 (3), 2001, pp. 223-239.
Bourne, L.M., SRMM: Stakeholder Relationship Management Maturity, Proceeding of PMI Global Congress, St. Julians, Malta, 2008.
Bay, A.F., Skittmore, M., and Susilawati, C., Tingkat Kematangan Manajemen Proyek: Survei Di Beberapa Tempat Di Indonesia, Dimensi Teknik Sipil, 7(2), pp. 81-89.
Hillson, D., Towards a Risk Maturity Model, International Journal of Project and Business Risk Management, 1(1), 1997, pp. 35-45
Hillson, D., Assessing Organizational Project Management Capability, Journal of Facilities Management, 2(3), 2003, pp. 298-311.
Badan Pendukung Pengembangan Sistem Penyediaan Air Minum (BPPSPAM), Indonesia Water Supply Infrastructure PPP Investment Opportunities, Kementerian Pekerjaan Umum, Jakarta, 2010.
Q. Zhang, Criteria for Selecting the Private-Sector Partner in Public-Private Partnerships, Journal of Construction Engineering and Management, 131(6), 2005, pp. 631-644.
George, D. and Mallery, P., SPSS for Windows step by step–A Simple Guide and Reference 9.0 Update, 2nd Edition, Allyn and Bacon, Boston, 2000.
Articles published in the Civil Engineering Dimension (CED) will be Open-Access articles distributed under the terms and conditions of the Creative Commons Attribution License (CC BY). CED allows the author(s) to hold the copyright without restrictions and retain the publishing rights without restrictions.





