Queuing Rule of Thumb based on M/M/s Queuing Theory with Applications in Construction Management
Downloads
Downloads
Hendrickson, C. and Tung, A., Project Manage-ment for Construction - Fundamental Concepts for Owners, Engineers, Architects and Builders, Prentice Hall, 1998. http://pmbook.ce.cmu.edu/ 04_labor_material,_and_equipment_utilization.html.
Oberguggenberger, M., Queueing Models with Fuzzy Data in Construction Management in: W. Fellin et al (Editors) Analyzing Uncertainty in Civil Engineering, Springer, 2004. pp. 197-208.
http://www.globalspec.com/reference/34589/ 203279/ queueing-models-with-fuzzy-data-in-construction-management
Cheng, M.Y., Tsai, H.C., and Lai, Y.Y., Construc-tion Management Process Reengineering Perfor-mance Measurements, Automation in Construc-tion 18, 2009, pp.183-193. http://www.ct.ntust. edu.tw/ct/filesConstruction%20management%20process%20reengineering%20performance%20measurements. pdf. See also: http://140.118.5.71/bpr%20 files/Bpr_ Evaluation.pdf.
Tian, N. and Zhang, Z.G., Vacation Queueing Theory Model – Theory and Application, Springer, 2006.
Yue, W. et al., Advances in Queueing Theory and Network Applications, Springer, 2009. [CrossRef]
Hall, R.W., Queueing Methods for Services and Manufacturing, Prentice Hall, 1991.
Carmichaela, D.G., Shovel–truck Queues: a Reconciliation of Theory and Practice, Construction Management and Economics, 4(2), 1986, pp.161-177. http://www.tandfonline.com/doi/abs/10.1080/01446 198600000013.
Articles published in the Civil Engineering Dimension (CED) will be Open-Access articles distributed under the terms and conditions of the Creative Commons Attribution License (CC BY). CED allows the author(s) to hold the copyright without restrictions and retain the publishing rights without restrictions.





