Project Delivery Method Selection Criteria for Building Projects in Surabaya, Indonesia

Authors

  • Andi Petra Christian University
  • Stephanus Eduard Sugianto Petra Christian University
  • Yosep Setiadi Lukas Petra Christian University

:

https://doi.org/10.9744/ced.26.2.111-119

Keywords:

project delivery method, Analytical Hierarchy Process, single general contractor, multiple primes, design and build, owner

Abstract

Selecting an appropriate Project Delivery Method (PDM) is a crucial decision for owners that significantly influences the success of a construction project. Various criteria, such as the nature of construction projects and the specific characteristics of owners and projects, should be properly considered to make this decision. This paper first assesses and evaluates the key criteria for selecting a PDM for building projects in Surabaya. It then proposes a multi-criteria decision-making model for the selection of three PDMs, namely Single General Contractor, Multiple Primes, and Design and Build. A three-step questionnaire survey was conducted to achieve the objectives. The initial analysis revealed six important selection criteria, which were then modelled and used in the subsequent survey. Using the Analytical Hierarchy Process (AHP) procedures, the second analysis determined the weights of each criterion for the three PDMs. The paper discusses these weights, suggesting the relative strengths of each PDM. Finally, the paper tests the robustness of the model using three building projects in Surabaya.

Author Biography

Andi, Petra Christian University

Petra Christian University, Surabaya, INDONESIA, SCOPUS ID = 7409720298

References

Ervianto, W.I. Manajemen Proyek Konstruksi, Andi, Yogyakarta, 2005.

Alberto, L. and Liman, S., Pengaruh dari Faktor-faktor yang Berperan dalam Pemilihan Project Delivery System di Surabaya, Undergraduate Thesis, Petra Christian University, 2012.

El-Sayegh, S., Evaluating the Effectiveness of Project Delivery Methods, Construction Management and Economics, 23(5), 2008, pp. 457-465.

Hosseini, A., Lædre, O., Andersen, B., Trop, O., Olsson, N., and Lohne, J., Selection Criteria for Delivery Methods for Infrastructure Projects, In World Congress International Project Management Association, Procedia – Social and Behavioral Sciences, 2016, pp. 250-268.

Barrie, D.S. and Paulson, B.C., Professional Construction Management, 3rd Ed., McGraw-Hill, 1992.

Gilbreath, R.D., Managing Construction Contracts, 2nd Ed., John Wiley & Sons, NY, 1992.

Fisk, E.R., Construction Project Administration, 5th Ed., Prentice Hall, New Jersey, 1997

Khalil, M.I.A., Selecting the Appropriate Project Delivery Method using AHP, International Journal of Project Management, 20(6), 2002, pp. 469-474.

The Construction Management Association of America, An Owner’s Guide to Project Delivery Methods, 2012.

Carpenter, N. and Bausman, D.C., Project Delivery Method Performance for Public School Construction: Design-bid-build versus CM at Risk, Journal of Construction Engineering and Management, 142(10), 2016, pp. 1-10.

Pooyan, M.R., A Model for Selecting Project Delivery Systems in Post-Conflict Construction Projects, Master Thesis, Concordia University, 2012.

Al-Tabtabai, H.M, Selection of Project Delivery System using Analytical Hierarchy Process, In Project Management Institute Annual Seminars & Symposium, San Antonio, 2002.

Mafakheri, F., Dai, L., Slezak, D., and Nasiri, F., Project Delivery System Selection under Uncertainty: Multicriteria Multilevel Decision Aid Model, Journal of Management in Engineering, 23(4), 2007, pp. 200-206.

Liauwnoto, S., Model Pemilihan Kontraktor Pemenang Tender di Sektor Swasta Menggunakan Analytical Hierarchy Process, Master Thesis, Petra Christian University, 2009.

Saaty, T.L., The Analytic Hierarchy Process: Planning, Priority Setting, Resource Allocation, 2nd ed., Pittsburgh, PA: RWS Publications, 1990.

Saaty, T.L. and Ozdemir, M.S., Why the Magic Number Seven Plus or Minus Two, Mathematical and Computer Modelling, 38(3-4), 2003, pp. 233-244.

Saaty, T.L. and Kearns K.P., Analytical Planning: The Organization of Systems, 1st ed., RWS Publication, 1985.

Downloads

Published

2024-09-13

How to Cite

Andi, A., Sugianto, S. E., & Lukas, Y. S. (2024). Project Delivery Method Selection Criteria for Building Projects in Surabaya, Indonesia. Civil Engineering Dimension, 26(2), 111-119. https://doi.org/10.9744/ced.26.2.111-119

Most read articles by the same author(s)

1 2 > >>